Customization: | Available |
---|---|
Technics: | Cold Pressing |
Standard: | GB |
Still deciding? Get samples of US$ 10/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Forged Eye Shaft Screw Anchor Hot Dip Galvanized ASTM A153
Anchor rod is also called guy anchor rods, thimble rod or thimble eye anchor rod. According to the application, there are power line anchor, utility pole anchor or guy wire anchor rods. Anchor rods are dropped forged to single or double strand eyes. Alternatively anchor rods are furnished with oval eyes together with an equivalent number of wire strand thimble. All thimbles size accommodates the size of stay wire strand.
Anchor rod has a strong and durable physical property to withstand storms and disasters. To ensure the safety and steady of the pole line, it's important to use high-quality anchor rod to install the overhead power lines. SaLi has produced the thimble eye anchor rod for more than 10 years and is ready to increase your volume in your market.
For the forged eye shaft screw anchor can be installed manually by inserting a bar through the eye and screwing the anchor down.
Thimble Eye Thimble Eye Thimble Eye |
|||||||||
Shaft Diameter Inch |
Length Feet |
Helix Diameter Inch |
Stock No |
ADDrOx. Ship WtKg /100 Pcs. |
Stock No |
Approx. Ship WtKg /100 Pcs |
Stock No |
Appro× Ship WtKg /100 Pcs |
|
3/4 |
6 | 6 |
A1501-06 474.00 A1504-06 464.00 A7207-06 φ |
||||||
7 | A1501-07 530.00 A1504-07 540.00 A7207-07 φ |
||||||||
8 | A1501-08 588.00 A1504-08 598.00 A7207-08 φ |
||||||||
6 | 8 |
A1502-06 543.00 A1504-06 552.00 A7208-06 φ |
|||||||
7 | A1502-07 598.00 A1505-07 609.00 A7208-07 568.00 |
||||||||
8 | A1502-08 657.00 A1505-08 665.00 A7208-08 632.00 |
||||||||
1 | 7 | 8 |
A1503-07 918.00 A1506-07 1.012.00 A7209-07 685.00 |
||||||
8 | A1503-08 1,091.00 A1506-08 1.129.00 A7208-08 φ |
||||||||
9 | A1503-09 1.212.00 A1506-09 1.245.00 A7208-09 φ |
||||||||
10 |
A1503-10 1.324.00 A1506-10 1.362.00 A7208-10 φ |
As one of the most professional electrical power energy manufactures,Winner Electric Energy Co., Ltd is based in Beijing and we provide transmission and distribution services, including power fittings, cable accessories, and insulators. We specialize in primary and secondary fusion pole-mounted circuit breakers, lightning arresters, solar energy, and other new energy transmission and distribution equipment products. We have two factories and all kinds of certificates to back up the quality of our products. In the past fifteen years, our products have been exported to many countries in the world, such as the United States, UK, France, Japan and South Africa. Our customers not only enjoy high-quality products but also excellent after-sales service. Don't hesitate to contact us today to learn more about our offerings!
1. Rich manufacture experience.
2. Domestic and overseas markets.
3. Well equipped with complete facilities.
4. Strict quality control and excellent after-sales service.
5. In addition to supplying varieties of types and specifications to our customers, we also accept customized product.
Import duties,taxes and charge are not included in the price or shipping charge. These charges are the buyer's responsibity.
Please check with your country's customs office to determine what these additional costs will be prior to buying.We usually mark the goods for a low cost on the customs declaration and we are trying to help you minimize or avoid GST or V.A.T.or other import taxes,but we can't guarance no tax charge as it is depends on your country's policy.
1. Are you a factory or trading company?
We are a Trade company.
2. Where is your factory located? How can I visit there?
Our factory is located in Handan City,Hebei Province, China.
All our clients,from home or abroad, are warmly welcome to visit us!
3. What's the payment term?
We accept TT, 30% deposit and 70% balance agaisnt copy of BL, Western Union, L/C is OK!
4. How's the delivery time?
Usually it will take about 15~30 days for production.
5. Tell me the standard of package?
For the small capacity, it uses carton with pallet or according to your requirements.
6. Could you offer Form A or C/O etc. certificate of origin ?
It is totally not a problem.
7. Would you accept to use our logo ?
If you have a good quantity,it is absolutely no problem to do OEM.
8. How about the transport?
If the number of goods is small we usually use TNT,DHL,FEDEX,EMS and some express you offered.
If the number of the goods is big usually we use the FWD you offered or we provided. Either by sea or by air is OK.
Once you have received your item, please leave feedback for us as this will inform us that you have received your items.
Your satisfaction is most important for us. If you have a problem or question regarding your transaction, please contact us before leaving any type of feedback. And give us the opportunity to reasonably rectify in a reasonable amount of time, whatever your concern may be.
Negative feedback does not solve anything. We are always willing to work things out. So feel free to contact us.