Power Accessories Wire Assembly Tension Dead End/ Clamp Cable/ Insulation Suspension Clamp

Product Details
Customization: Available
Technics: Cast
Standard: ASTM 153
Still deciding? Get samples of US$ 0/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment methods: visa mastercard discover JCB diners club american express T/T
  Support payment in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Experienced Team
The supplier has 5 foreign trading staff(s) and 4 staff(s) with over 6 years of overseas trading experience
Flexible Customization
The supplier provides Flexible customization services for your Personalized requirements
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (11)
  • Power Accessories Wire Assembly Tension Dead End/ Clamp Cable/ Insulation Suspension Clamp
  • Power Accessories Wire Assembly Tension Dead End/ Clamp Cable/ Insulation Suspension Clamp
  • Power Accessories Wire Assembly Tension Dead End/ Clamp Cable/ Insulation Suspension Clamp
  • Power Accessories Wire Assembly Tension Dead End/ Clamp Cable/ Insulation Suspension Clamp
  • Power Accessories Wire Assembly Tension Dead End/ Clamp Cable/ Insulation Suspension Clamp
  • Power Accessories Wire Assembly Tension Dead End/ Clamp Cable/ Insulation Suspension Clamp
Find Similar Products
  • Overview
  • Product Description
  • Company Profile
  • Detailed Photos
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
D72565-01
Type
Pull-Line Fitting
Material
Stainless Steel
Surface
Galvanized
Application
Manually Installed
Purpose
Pole Installation
Transport Package
Standard Exportation Carton
Specification
ASTM153
Trademark
None
Origin
China
HS Code
85389000
Production Capacity
100000

Packaging & Delivery

Package Size
30.00cm * 30.00cm * 10.00cm
Package Gross Weight
5.000kg

Product Description

Product Description

* Material: Die cast steel/ductil iron;
* Breaking load: 70~200KN;
* Advise model No or provide detailed specification when enquire;
* Socket eye, socket cleivs, clevis socket

Company Profile

Beijing Winner Electric Power Energy Co.,LTD is located in Beijing China, integrating not only R&D and manufacturing, but also trade and top aftersales services as well. We're proud of having two excellent subsidiary factories, which consolidated our leading 

position of transmission and distribution services provider. One of the factory covers an area of 160000 square meters and has over 100 employees. Our products have been exported to Asia, America, Africa and South America for 15 years.  

We produce power fittings, cable accessories, insulators, primary and secondary fusion pole-mounted circuit breakers, lightning arresters, solar energy, and other new energy transmission and distribution equipment products, as well as related customized products. 

At Winner Power, we don't compromise on quality. Our stringent standards guarantee that you receive reliable and efficient products. Our advantage and experience in the industry allow us to be your top priority choice for all your transmission and distribution needs.

Detailed Photos

 

 

Stock No. Connector included Dimension Ultimate Strength Lbs Approximate Shipping Weight Kg/100pcs Standard Packaging Qty./Bundle
    A B C U bolt inch      
D7256-01 Socket 7 2-1/8 1-3/16 1/2 18,000 145.00 24
D72565 None           95.00 24
D74085-01 Socket 7-1/2 2-2/4 7/8 1/2 25,000 165 24
D77017-01 None           114 24
D77017 Socket 8 27/16 8 5/8 30,000 254 24

Certifications

Power Accessories Wire Assembly Tension Dead End/ Clamp Cable/ Insulation Suspension Clamp
Power Accessories Wire Assembly Tension Dead End/ Clamp Cable/ Insulation Suspension Clamp
Power Accessories Wire Assembly Tension Dead End/ Clamp Cable/ Insulation Suspension Clamp

 

Power Accessories Wire Assembly Tension Dead End/ Clamp Cable/ Insulation Suspension ClampPower Accessories Wire Assembly Tension Dead End/ Clamp Cable/ Insulation Suspension Clamp
Packing&Shipping


Power Accessories Wire Assembly Tension Dead End/ Clamp Cable/ Insulation Suspension Clamp

FAQ

 

1. Are you a factory or trading company?

We are a factory  branch.

2. Where is your factory located? How can I visit there?

Our factory is located in Handan City,Hebei Province, China.  

All our clients,from home or abroad, are warmly welcome to visit us!

3. What's the payment term?  

We accept TT, 30% deposit and 70% balance agaisnt copy of BL, Western Union, L/C  ok!

4. How's the delivery time?

Usually it will take about 15~30 days for production.

5. Tell me the standard of package?

For the small capacity, it uses carton with pallet or according to your requirements.

6. Could you offer Form A or C/O etc. certificate of origin  ?  

It is totally not a problem.

7. Would you accept to use our logo ?

If you have a good quantity,it is absolutely no problem to do OEM.

8. How about the transport?

If the number of goods is small we usually use TNT,DHL,FEDEX,EMS and some express you offered.

If the number of the goods is big usually we use the FWD you offered or we provided. Either by sea or by air is OK.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier